K.KRIV’S
PROPERTIES

PROJECT BRIEF / Cebu IT Park

The Wave Towers

An official Cebu Landmasters disclosure identifies The Wave Towers as a Japanese-inspired development in Cebu IT Park, developed with NTT UD Asia through CLI NUD Ventures.

The project at a glance

Developer / project partner
Cebu Landmasters / NTT UD Asia
Broad location
Cebu IT Park, Cebu, Philippines
Property format
Condominium
Browse category
Premium Properties · Investment Properties

Identity, location and descriptive facts follow the project source below. Category placement is provisional editorial organisation, not a verified price tier.

What makes this a different decision?

The IT Park setting makes the intended daily routine a useful starting point. For a rental plan, investigate the exact unit’s competition and net costs rather than assuming a business-district address establishes demand.

Strategies to investigate: Long-Term Rental · End-Use + Investment. These labels are discussion prompts. They do not establish permitted use, returns, availability or suitability for your circumstances.

Pricing, availability and dated sources

MyHouse’s listed status and price estimates are shown below. Ask Kriv for the final computation and availability for the specific property you choose.

Price estimate

₱7.6M – ₱54.7M

Project-level guide price from MyHouse. The exact unit, payment method, inclusions and charges affect the final computation.

Listed project status

Pre-selling

Ready-for-occupancy and pre-selling labels may cover different buildings or phases. Confirm the status and availability of the selected property.

MyHouse.ph listing: The Wave Towers · Source date: Not established · Reviewed: 2026-10-06

Availability

The 5 October 2026 Tower 1 residential snapshot reports 273 open, 24 on hold and 412 sold units (709 total). Reconfirm a selected unit before reservation.

The Wave Towers sales monitoring (68), residential page 1 · Source date: 2026-10-05 · Reviewed: 2026-10-05

Project / tower status

Phase 1 comprises Nagomi Tower and the retail podium. Tower 2 is described as future development in Cheat Sheet v11.

The Wave Towers Cheat Sheet v11 — publication date not stated; Drive modified 12 September 2025 · Source date: Not established · Reviewed: 2026-10-05

Developer turnover target

Cheat Sheet v11 lists a developer target of 2030. Its publication date is not stated and the Drive copy was modified in September 2025; obtain an updated schedule and the selected unit’s contract terms.

The Wave Towers Cheat Sheet v11 — publication date not stated; Drive modified 12 September 2025 · Source date: Not established · Reviewed: 2026-10-05

Unit types

Nagomi Tower: studios, junior and regular one-bedroom and two-bedroom residences, three-bedroom and three-bedroom bi-level residences.

The Wave Towers Cheat Sheet v11 — publication date not stated; Drive modified 12 September 2025 · Source date: Not established · Reviewed: 2026-10-05

Unit sizes

Cheat Sheet v11 lists studios at 24–31 m²; one-bedroom junior at 38 m²; one-bedroom at 48–58 m²; two-bedroom junior at 67–71 m²; two-bedroom at 76–97 m²; three-bedroom at 103–125 m²; and bi-level at 137–182 m². Confirm the selected layout.

The Wave Towers Cheat Sheet v11 — publication date not stated; Drive modified 12 September 2025 · Source date: Not established · Reviewed: 2026-10-05

Developer-described amenities

The developer describes pools, a theater room, function room, children’s areas, spa pavilion, sauna and Japanese garden chapel on the sixth floor, with a library lounge and gym on the 37th floor. These are planned facilities in Cheat Sheet v11.

The Wave Towers Cheat Sheet v11 — publication date not stated; Drive modified 12 September 2025 · Source date: Not established · Reviewed: 2026-10-05

Payment plans

Ask Kriv for the current unit-specific terms and full payment schedule.

Request latest computation ↗

Who this may suit

You want to examine an IT Park residence for personal use or a rental strategy that still needs evidence.

When I would look at something else

Your decision requires immediate occupancy or a proven net yield that has not been documented.

Preliminary comparison criteria, not a personal recommendation from Kriv. His approved project-specific view appears separately below when available.

Questions before a shortlist becomes a decision

  • Which tower and layout match your intended use?
  • What are the selected unit’s current schedule and payment obligations?
  • How does its total cost compare with relevant existing residences?

Request written answers tied to the selected unit or lot. A general project description cannot settle unit-specific charges, contractual conditions or permitted use.

THE PERSONAL PERSPECTIVE

Kriv’s View

Kriv’s project-specific view is pending a review of current materials and your priorities. This brief does not present an unapproved opinion as his recommendation.

Ask Kriv for his view on The Wave Towers ↗

Read the evaluation framework

Direct answers

How much cash is required?

Request a current computation covering reservation, equity, financing, fees and the full payment schedule.

Is this ready for occupancy, and when is turnover?

MyHouse lists this project as Pre-selling (reviewed 2026-10-06). Confirm the selected property and delivery terms with Kriv. Cheat Sheet v11 lists a developer target of 2030. Its publication date is not stated and the Drive copy was modified in September 2025; obtain an updated schedule and the selected unit’s contract terms.

Can I use Pag-IBIG or bank financing?

Financing has not been confirmed for the selected property or buyer. Ask Kriv to obtain the current options and requirements.

Is Airbnb or another short-stay use appropriate?

No permission or return is established by this brief. Confirm building or estate rules, relevant requirements, management arrangements and full operating costs before relying on that strategy.

What are the monthly dues?

Current dues and other recurring charges are pending. Request the schedule that applies to your exact property.

Sources and information status

Cebu Landmasters / NTT UD Asia official source · Reviewed 2026-10-05 for stable identity and description. Publication date not established unless stated in the source itself.

Supplied claims and dated examples are attributed beside each item above. A review date records when the supplied material was checked; it does not make an older offer current or establish a contractual promise. Kriv’s latest confirmed unit-specific information takes priority.

Keep the comparison open

These are other projects in the region, not assertions of equivalent price, quality or investment performance.

RESEARCH THE DECISION

Questions behind the shortlist